{"id":1585,"date":"2014-02-15T20:25:19","date_gmt":"2014-02-16T01:25:19","guid":{"rendered":"http:\/\/www.leucht.com\/blog\/?p=1585"},"modified":"2014-02-15T20:27:44","modified_gmt":"2014-02-16T01:27:44","slug":"bats-need-houses-too","status":"publish","type":"post","link":"http:\/\/www.leucht.com\/blog\/2014\/02\/bats-need-houses-too\/","title":{"rendered":"Bats need houses too!"},"content":{"rendered":"<p>I got a wild hair today and I built a house for my resident bats that do such a good job of keeping the mosquito population under control. \u00a0Building a bat house is pretty easy and it only takes a few small pieces of wood. \u00a0What follows are easy step by step instructions for building a small and simple bat house. \u00a0It&#8217;s so easy you can do it yourself!<\/p>\n<p>I searched the Internet for some plans and ended up drawing up my own design based on a few of the simpler designs that I found on the Internet. \u00a0Here is a photo of my plans. \u00a0(Click on any image to see the full resolution version.)<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/01-bat-house-plans.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1591\" alt=\"01 - bat house plans\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/01-bat-house-plans-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/01-bat-house-plans-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/01-bat-house-plans-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>It might be hard to read, but basically it only takes a 12 inch by 12 inch piece of plywood for the back, plus a couple smaller plywood pieces for the front and one more for the roof, plus several thin slats. \u00a0Here is a photo of all the wood for my bat house project, except for the roof, which I cut last after the rest was put together.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/02-parts-cut.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1592\" alt=\"02 - parts cut\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/02-parts-cut-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/02-parts-cut-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/02-parts-cut-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>You can see the 12 by 12 plywood piece for the back, plus a 12 by 5 plywood piece and a 12 by 4 plywood piece for the front, plus 4 wood slats that are 1\/2 inch by 1 inch and around 10 inches long. \u00a0I cut the slats to their proper length during construction to fit the front of the house, so right now they are just a little long. \u00a0The plywood I used was some thin veneer that I had laying around that was leftover from another project. \u00a0But you can use plywood of any thickness for this project. \u00a0The thickness of the front and back will determine the final size of the roof piece, so that&#8217;s one reason to cut that piece last.<\/p>\n<p>The picture below shows one slat is cut along it&#8217;s short 1\/2 inch side at an angle for the roof. \u00a0I did not measure the angle &#8230; I just eyeballed it on my bandsaw. \u00a0Then I took the one that I had cut and I used it as a template to draw the angle on the other three slats. \u00a0That way they will all be the same angle.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/03-one-slat-cut.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1593\" alt=\"03 - one slat cut\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/03-one-slat-cut-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/03-one-slat-cut-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/03-one-slat-cut-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>The photo below shows all four slats laid out on the 12 by 12 back piece. \u00a0You can also see a piece of screen that I had laying around that I cut to use as the landing pad for the bats. \u00a0The bats need a surface to land on that they can hold onto with their tiny claws. \u00a0A surface that is soft or rubbery or something like this screen will do fine.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/04-slats-laid-out.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1594\" alt=\"04 - slats laid out\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/04-slats-laid-out-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/04-slats-laid-out-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/04-slats-laid-out-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Below you can see the front pieces laid down on the slats. \u00a0Nothing is being attached together at this point. \u00a0I am only test fitting everything to make sure it&#8217;s all the right size. \u00a0The reason the front is in two pieces is that a bat house needs some ventilation in a way that does not allow rain to pour in.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/05-front-pieces-fit-check.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1595\" alt=\"05 - front pieces fit check\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/05-front-pieces-fit-check-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/05-front-pieces-fit-check-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/05-front-pieces-fit-check-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Above you can see how the four spacer slats stick out beneath the front pieces. \u00a0I marked them and cut them off and below you can see them now at the proper length.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/06-fit-check-reverse-angle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1596\" alt=\"06 fit check reverse angle\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/06-fit-check-reverse-angle-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/06-fit-check-reverse-angle-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/06-fit-check-reverse-angle-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Now that everything is verified to be the correct size, I&#8217;m ready to attach my landing pad. \u00a0I used an office stapler to attach the screen to the plywood. \u00a0In the photo below, you can see that I started on the back side and attached the screen. \u00a0Then I rolled the screen around to the front side of the plywood and stapled it every couple of inches. \u00a0I used staples because my material is metal screen. \u00a0If you use foam matting or rubber matting or something like that, glue will probably work just fine.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/07-screen-started-on-back-side.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1597\" alt=\"07 - screen started on back side\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/07-screen-started-on-back-side-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/07-screen-started-on-back-side-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/07-screen-started-on-back-side-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Below you can see the landing pad completely installed from the front side where the bats will land.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/08-screen-finished.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1598\" alt=\"08 - screen finished\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/08-screen-finished-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/08-screen-finished-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/08-screen-finished-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Now it&#8217;s time to assemble the spacer slats onto the back plywood piece. \u00a0I&#8217;m going to assemble the slats onto the plywood back now, but I will hold off assembling the front pieces and the roof. \u00a0This is because the back needs to be installed onto my tall light pole first and then the front pieces and the roof can be installed. \u00a0Otherwise, installation of the bat house on the light pole will be much harder after the whole thing is fully assembled. \u00a0I used Liquid Nails to glue the wood pieces to each other. \u00a0I also am going to use screws for good measure. \u00a0This bat house will be outdoors and I want it to hold together for many years.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/09-slat-being-glued.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1599\" alt=\"09 - slat being glued\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/09-slat-being-glued-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/09-slat-being-glued-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/09-slat-being-glued-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>You can see below that I used wood clamps to hold the wood together tight and then I installed some screws. \u00a0Between the glue and the screws, plus a coat of primer and a couple coats of outdoor latex paint, I&#8217;m hoping this bat house lasts for many many years.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/10-slat-being-screwed-in.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1600\" alt=\"10 - slat being screwed in\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/10-slat-being-screwed-in-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/10-slat-being-screwed-in-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/10-slat-being-screwed-in-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Here it is on the light pole that I want it to be installed on. \u00a0There were a couple bolts sticking out of the light pole that I had to accomodate. \u00a0I&#8217;m going to put some smaller holes and then wrap picture wire around and around several times in order to hold the bat house in place on the round pole.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/11-fit-check-on-pole.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1601\" alt=\"11 - fit check on pole\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/11-fit-check-on-pole-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/11-fit-check-on-pole-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/11-fit-check-on-pole-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>This photo shows the larger holes for the light pole bolts plus four smaller holes that I drilled for the picture wire.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/12-holes-for-pitcure-wire-hanging.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1602\" alt=\"12 - holes for pitcure wire hanging\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/12-holes-for-pitcure-wire-hanging-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/12-holes-for-pitcure-wire-hanging-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/12-holes-for-pitcure-wire-hanging-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Now I screwed the front pieces on, but I did not turn the screws down tight. \u00a0I put the screws in just enough to make holes that I can find again later after it is painted.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/13-start-screws-in-front.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1603\" alt=\"13 - start screws in front\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/13-start-screws-in-front-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/13-start-screws-in-front-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/13-start-screws-in-front-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Now I found a piece of plywood big enough to use as the roof. \u00a0I cut it out and centered it in place and then I marked it&#8217;s final location as the photo below shows.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/14-mark-location-of-roof.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1604\" alt=\"14 - mark location of roof\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/14-mark-location-of-roof-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/14-mark-location-of-roof-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/14-mark-location-of-roof-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Then I laid the bat house next to the roof so I could mark where the slats are located so I can put screws through the roof directly into the center of these four slats.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/15-mark-location-of-slats-on-roof.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1605\" alt=\"15 - mark location of slats on roof\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/15-mark-location-of-slats-on-roof-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/15-mark-location-of-slats-on-roof-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/15-mark-location-of-slats-on-roof-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Then I installed the roof, but not tight. \u00a0Just to make screw holes that I can find again after it&#8217;s painted.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/16-start-screws-on-roof.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1606\" alt=\"16 - start screws on roof\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/16-start-screws-on-roof-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/16-start-screws-on-roof-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/16-start-screws-on-roof-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Now I took the front and roof pieces off again so I can paint everything separately.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/17-take-it-apart-for-painting.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1607\" alt=\"17 - take it apart for painting\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/17-take-it-apart-for-painting-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/17-take-it-apart-for-painting-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/17-take-it-apart-for-painting-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Then I primered everything.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/18-primer.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1608\" alt=\"18 - primer\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/18-primer-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/18-primer-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/18-primer-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Then I painted everything. \u00a0I actually put two nice thick coats of paint because I want this to be nice and waterproof and last for many years, hopefully. \u00a0You don&#8217;t really want a bat house to be brightly colored. \u00a0It should not really stand out. \u00a0I had a dark brown paint handy so I used that. \u00a0Painting through the screen was not easy, but I did it. \u00a0Next time, I think I would probably paint the wood under the screen before installing the screen.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/19-dark-paint.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1609\" alt=\"19 - dark paint\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/19-dark-paint-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/19-dark-paint-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/19-dark-paint-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p>Then I hung the back piece as I described earlier using the picture wire to wrap around the pole several times.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/20-back-is-installed-on-pole.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1610\" alt=\"20 - back is installed on pole\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/20-back-is-installed-on-pole-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/20-back-is-installed-on-pole-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/20-back-is-installed-on-pole-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/p>\n<p><span style=\"line-height: 1.5em;\">\u00a0Then I screwed the front pieces and the roof on. That&#8217;s all! \u00a0The bat house is complete and ready for occupants!<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"line-height: 1.5em;\"><a href=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/21-final-product-bat-house.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-1611\" alt=\"21 - final product - bat house\" src=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/21-final-product-bat-house-400x300.jpg\" width=\"400\" height=\"300\" srcset=\"http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/21-final-product-bat-house-400x300.jpg 400w, http:\/\/www.leucht.com\/blog\/wp-content\/uploads\/2014\/02\/21-final-product-bat-house-1024x768.jpg 1024w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><\/span><\/p>\n<p>Thanks for taking the time to read these step by step bat house directions! \u00a0Let me know if you have any comments or feedback and definitely let me know if you used these directions to make your own bat house! \u00a0Leave comments below on this blog post or send me an email by clicking the email link below in the page footer.<\/p>\n<p>Thanks!<\/p>\n<p>Kurt<\/p>\n","protected":false},"excerpt":{"rendered":"<p>I got a wild hair today and I built a house for my resident bats that do such a good job of keeping the mosquito population under control. \u00a0Building a bat house is pretty easy and it only takes a few small pieces of wood. \u00a0What follows are easy step by step instructions for building [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[106,107,111],"tags":[45,206,205,140,15],"_links":{"self":[{"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/posts\/1585"}],"collection":[{"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/comments?post=1585"}],"version-history":[{"count":9,"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/posts\/1585\/revisions"}],"predecessor-version":[{"id":1615,"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/posts\/1585\/revisions\/1615"}],"wp:attachment":[{"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/media?parent=1585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/categories?post=1585"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.leucht.com\/blog\/wp-json\/wp\/v2\/tags?post=1585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}